This is a status update on the hot tub.
As of this morning, both pumps are working, the water level is correct and is auto-filling as it should, and the water is at the desired temperature.
The jets are operational but we have more work on them scheduled this week.
If all goes well, we will install a new heater within a couple of weeks. The heater replacement will take a day or two, during which time the hot tub will be unavailable.
Please remind those who use the hot tub to replace the cover after use.
Thanks for your patience!
— Sheila